[1]
M. Borges, C. de Oliveira, M. Callefi, F. J. Gómez Paredes, and S. Shiramizu, “Applying the MASP Methodology to Reduce Production Time: The Case of a Furniture Industry”, ilia, no. 1, pp. 146–154, Oct. 2024, doi: 10.51378/ilia.vi1.8520.